By placing an order for this commercial conveyor oven (Natural Gas or Propane/LP), the buyer acknowledges and agrees to the following installation requirements:
• The gas connection hose is not included and must be purchased separately. It must be on-site prior to installation.
• A grounded 110V electrical outlet must be available and functional near the installation area.
• The gas line must be installed by a licensed professional before the scheduled installation.
• The buyer must notify us after purchase whether the oven will be connected to Natural Gas or Propane (LP).
• A compatible gas shut-off valve and regulator must be installed and accessible.
• Our technician will not install, modify, or alter gas or electrical infrastructure.
• The oven must be unboxed and placed in its final installation location before the technician arrives.
• If the site is not properly prepared, additional service or rescheduling fees may apply.
Please ensure all installation requirements are met prior to scheduling service. For questions or clarification, please contact our team.